Maitai Tahunanui Satellite

Date completed: 06 October 2023

Budget: $3.5m

Location: Tāhunanui, Nelson

Client: Ministry of Education – Capital Works

Role: Project Management & Quantity Surveying services

 
 

Maitai-Tāhunanui Satellite (named ‘Mahitahi’) is a 300m2 satellite teaching space for specialist school, Maitai Base, at Tāhunanui School.

The intention of the project has been to create a space that meets the diverse needs of some of Maitai’s students, whilst enabling integration between the specialist space and the host school

Consultation with several varied stakeholders and manawhenua, whilst navigating a complicated brief and introducing cultural narrative into the space, were key considerations of this project.

The result: a quality product, delivered within budget and in time for Term 4 2023.

Cawthron National Algae Research Centre

Date of completion: 2022

Budget: $3 Million

Location: Nelson

Client: Cawthron Research Institute 

Role: Project Management & Quantity Surveying

Cawthron Institute’s National Algae Research Centre (NARC) is a 435m2 facility sited at the Glenduan Cawthron Aquaculture Park, north of Nelson. It is a pragmatic, quality extension of the existing facility. The Institute is New Zealand’s largest private science organisation, with more than 300 scientists.

NARC offers a step-change in the Institute’s capacity to undertake research into how native red seaweed species can be harnessed to reduce livestock emissions when added to cattle feed, boost aquaculture yields, and be used for pain management. It allows the Institute’s scientists to further explore the economic and environmental value of different seaweed species and is a critical component in growing New Zealand’s aquaculture sector from $600m in 2020 to $3bn in 2035.

Cawthron Te Wero Aro-anamata

Date completed: 2022

Budget: $ 4.2 million

Location: Stoke, Nelson

Client: Cawthron Research Institute 

Role: Project Management  & Quantity Surveying Services

Redevelopment of a factory to house PC2 aquatic research laboratories for fin fish & shellfish research. The laboratories were fitted out to meet MPI accreditation and included the recirculating aquaculture systems to provide life support to fish and an onsite desalination/decontamination treatment plant for waste water.

Collingwood Area School

Date for completion: Feb 2024

Budget: $15.8 Million

Location: Collingwood, Tasman

Client: Ministry of Education

Role: Project Management & Quantity Surveying

Teaching Block

Re-development of Collingwood Area School offers an opportunity to provide facilities which enable 21st century learning and help to connect the wider community and local iwi with the school. the proposed new and revamped buildings will provide 230 students with quality learning environments which help foster collaboration between year groups, teaching staff, and community.

·       1000m2 new Teaching and library

building

·       300m2 new Administration & Resource

building

·       Refurbishment of existing Technology

building

·       New changing area to existing hall

·       ECI procurement model

Blessing of Administration Building

Golden Bay High School

Date for completion: April 2024

Budget: $25 Million

Location: Takaka, Tasman

Client: Ministry of Education

Role: Project Management & Quantity Surveying

Re-development of Golden Bay High School offers an opportunity to provide facilities which enable 21st century learning and help to connect the wider community and local iwi with the school. the proposed new and revamped buildings will provide 355 students with quality learning environments which help foster collaboration between year groups, teaching staff, and community.

·       813m2 new teaching and learning hub

·       807m2 new administration &

Wharenui building

·       421 m2 refurbishment technology

building

·       400m2 refurbishment of existing Hall

·       1047m2 refurbishment of existing

gymnasium

·       996m2 refurbishment of existing

science & art teaching building

·       207m2 refurbishment of existing

hospitality building

·       ECI procurement model

Takaka Co-Housing

Date Completed: Ongoing

Budget: $25M

Location: Takaka, Golden Bay

Client: Mohua Ventures

Role: Project Management & Quantity Surveying

The project comprises of a mixed development of approximately 100 residential units, 10 commercial units and community buildings over three stages/neighbourhoods.

Neighbourhood One is ongoing, which comprises of 17 duplex properties, 4 townhouses, a community house and a community shed. The 1st 10 units of Neighbourhood One are due for completion in the first quarter of 2023.

Wairarapa Terrace

2.png

Date Completed: 2017

Budget: $3.5M

Location: Christchurch

Client: Chris & Jenny Stokes

Role: Project Management & Quantity Surveying Services

3.png

A new high end private residence situated on the the banks of the Wairarapa Stream. This beautiful 500m2 home comes complete with a large swimming pool and private waterfront access to the Wairarapa Stream. The design incorporates some of the most advanced seismic strengthening design currently available and is designed well in excess of the current code requirements. The foundations also rest on a new gravel raft system which mitigates against liquefaction.

Cawthron Institute – Halifax Redevelopment Stage 1

Date Completed: 2013

Budget: $5M

Location: Nelson

Client: Cawthron Institute

Role: Project Management & Quantity Surveying

The Cawthron Institute is New Zealand’s largest independent research institute specialising in environmental research and research for the food and aquaculture industries. It also has substantial testing laboratories and provides seafood safety testing for key sectors of the aquaculture industry.

The new $5 million facility on its Halifax Street site will provide nearly 400 square metres of high specification laboratory space, to replace some of its present facilities built in the 1970s. In addition to laboratories the building will also include office space, meeting rooms and staff facilities.

This building is stage one of a four stage project to replace the facilities and laboratories in the Rigg building on the Halifax Street campus.  Two key requirements of the building’s design are sustainability and a design in keeping with the character of the neighbourhood.

The project includes the demolitions of existing structures.

Springlands Lifestyle Village

SLV21.png

Date Completed: ongoing

Budget: $50M

Location: Blenheim

Client: Springlands Lifestyle Village

Role: Project Management and Quantity Surveying services

2.jpg

A boutique style retirement village set in beautifully landscaped gardens. Comprising 78 Villas, 26 Apartments, 56 Care Rooms and a luxurious community centre. This project has won two awards including the National Winner of the Registered Master Builders Commercial Projects Award

108 Park Terrace

Date Completed: October 2022

Location: Christchurch

Role: Project Management & Quantity Surveying Services

A prestigious apartment development located on the edge of Hagley Park with views over the Avon River. Constructed over six floors with a covered ground floor parking, each apartment has large open plan living, high quality fittings and finishes and outdoor living areas.

SPATnz

2.png

Date Completed: 2015

Budget: $10.0M

Location: Glenduan, Nelson

Client: SPATnz

Role: Project Management & Quantity Surveying Services

11.jpg

The facility comprises two buildings with a total floor area of approximately 2500m2, set in a complex of seawater ponds, pipes and tanks etc totaling an area of 24,000m2. Split into several sub projects to facilitate the extensive site infrastructure and ground remediation Noble has provided full Project and Cost Management from concept design, consultant contracts including preliminary estimates, and construction cost management, tender packages, contract negotiations, contract agreements and full construction management.

The Village Palms

IMG-15 (1).jpg

Date Completed: 2017

Budget: $22M

Location: Christchurch

Client: The Village Palms Retirement Village Ltd

Role: Project Management and Quantity Surveying Services

IMG-19 (1).jpg

Demolition of an existing care facility and construction of a new 100 bed state of the art care and dementia hospital. The ground floor consists of 33 serviced apartments while the first floor consists of a 66 bed hospital with a secure dementia wing.

Cawthron Institute Finfish Research Centre

FFR1_1500.jpg
FFR2.jpg
FFR3.jpg

Date Completed: 2018

Budget: $7M

Location: Glenduan, Nelson

Role: Full Project and Cost Management

The Cawthron Finfish Research Centre is a state of the art facility including a 1650m2 insulated, bio-secure building with both freshwater and seawater holding tanks, in ground water treatment sumps, a wet lab and office area. Ground with poor bearing capacity was improved with deep soil mix columns to provide a solid platform for construction. Noble provided full Project and Cost Management from concept design to completion.

Merivale Retirement Village - Somme Street Facility

Somme Street 2.jpg

Date Completed: 2019

Budget: $16.5M

Location: Christchurch

Client: Merivale Retirement Village

Role: Project Management and Quantity Surveying

Somme Street 4.jpg

Merivale Retirement Village’s new state of the art care facility is due to open April 2019. Consisting of 22 luxurious ground floor apartments and 47 first floor care suits, the project will also include a bar, cafe, large open plan social areas and a first floor external terrace. This project is an exciting addition to Christchurch’s most desirable suburb

Nelson College New Roll Growth Classroom Block

P1120551.jpg

Date Completed: 2015

Budget: $1.9M

Location: Nelson

Client: Nelson College

Role: Project Management & Quantity Surveying Services

Construction of a contemporary designed new two storey 529m2 building. The structure of this building utilizes new timber technology construction system and is situated on a difficult sloping site.

This building consists of seminar spaces, leadership spaces, offices, meeting rooms, specialist classrooms and a General classroom.

Wineworks Bottling and Storage Warehouse Auckland

P2.jpg

Date Completed: 2017

Budget: $34M

Location: Onehunga, Auckland

Client: Wineworks / Sahara Ltd

Role: Project Management & Quantity Surveying Services

P1.jpg

Construction of a 16,201m2 warehouse, including workshop, breezeway, bottling plant, and office building.  Demolition and site preparation works comprised of demolition and removal of old concrete foundations and slabs, site excavation and remediation by removal of asbestos contaminated ground.  The structure comprises two levels of office building at north end, with 19m max height large volume warehousing and breezeway from north to south, also containing workshop (storage level over), and bottling area.

Olive Estate

13.png

Date Completed: Current Project

Budget: $55M

Location: Nelson

Client: The Integrity Care Group Ltd

Role: Quantity Surveying Services

IMG_65491.jpg

A large retirement village located in Richmond near Nelson, consisting of villas, town houses, apartments, hospital care facilities and a community centre all set in landscaped grounds including a large engineered lake which doubles as stormwater retention.

Portage Resort Hotel

Portage-Deck2.jpg

Date Completed: 2011

Budget: $5M

Location: Kenepuru Sound, Marlborough

Client: Portage Resort Hotel

Role: Project Management and Quantity Surveying Services

Portage-Main.jpg

Various projects including alterations, additions & refurbishment of this luxury resort.

Martin Hay and the team from Hay & Associates were involved with the redevelopment of The Portage Resort Hotel.  This commenced with the major refurbishment of the main building of the resort under the guidance of New Zealand award winning architect Pete Bossley.  Hay & Associates were employed as Project Managers and continued in this role for the resort upgrades.  The initial project was very demanding.  It had a tight budget and a very tight timeline of 7 weeks from the day the hotel closed to re-open scheduled for the Friday of Labour Weekend. In this time the building had to be stripped, rebuilt, painted, equipped and refurnished.  It was completed on time and on budget.  Subsequently Hay & Associates have been involved in a range of projects from staff quarters redevelopment, upgrades of café’s and stores and redevelopment of stairways and bathrooms.  All have been approached with a very genuine interest in what is best for the company, the hotel business and its strategic direction, so that we have felt a real sense of partnership in our ongoing relationship.’  Alison Evans

Aria Park

Date Completed: 2010

Budget: $18.4M

Location: Auckland

Client: Aria Park Retirement Village Ltd

Role: Project Management and Quantity Surveying Services

This addition to the Aria Park retirement complex involved the construction of a new luxurious five level apartment building including the formation of a basement. This complex project also required the construction of a bridge link and extensive landscaping works which enabled its integration with the existing residential community.